When Should an Operator Get Involved in a Real Estate Development Project?

In a real estate development designed for short-term rentals, profitability depends on more than location, construction quality, or the selling price of the units. Product design, furnishing, operating costs, commercial strategy, and the ability to deliver a consistent guest experience also play a role.

That is why one of the most important strategic decisions for a developer is determining when to bring a short-term rental operator into the project.

The ideal time is during the initial evaluation phase, before committing to the site or finalizing the main design decisions. This allows the operator to contribute commercial and operational expertise from the outset. If their involvement begins only after the building is completed, they can still help improve performance, but some decisions will be more difficult or expensive to change.

1. Before Acquiring the Site: Assess the Feasibility of the Rental Model

The operator’s involvement can begin even before the land is purchased. At this stage, their role is to assess whether the location, proposed product, and market conditions are compatible with a short-term rental program.

A location that is attractive for residential use does not necessarily offer the same opportunities for tourist accommodation. Demand, seasonality, competition, accessibility, and guest profiles all influence the project’s commercial positioning.

The initial assessment should address questions such as:

  • Is there sufficient demand for short-term accommodation in the area?
  • What type of guest is likely to choose the destination?
  • Which apartment types best match that demand?
  • What competitors are operating nearby, and how are their rates positioned?
  • Which services could differentiate the project?
  • What legal, planning, and operational requirements must be verified?

The assessment should also consider setup costs, furnishing, staffing, maintenance, and marketing. Revenue estimates should be tested against market data and realistic scenarios rather than assumptions of guaranteed returns.

The objective is not to justify an investment that has already been decided upon, but to determine whether the model makes sense and what conditions it would need to succeed. In some cases, the most useful conclusion may be to revise the concept or rule out short-term rentals as the primary strategy.

2. During Architectural Design: Create a Product That Can Be Operated Efficiently

Once initial feasibility has been assessed, the operator’s involvement becomes particularly important during architectural design.

Decisions about unit types, interior layouts, access points, building systems, and common areas affect both the guest experience and operational efficiency. The project should therefore be designed with more than appearance, saleable floor area, or residential buyer preferences in mind.

The operator can help assess aspects such as:

  • Unit mix: The distribution of studios, one-bedroom apartments, and larger units according to projected demand.
  • Interior layouts: Functionality, storage, privacy, and comfort for different lengths of stay.
  • Circulation and access: Movement of guests, housekeeping staff, and suppliers.
  • Service areas: Storage, laundry, reception, and other facilities when required by the operating model.
  • Common areas: Amenities that add value without creating disproportionate operating costs.
  • Maintenance: Accessibility of equipment, building systems, and components that require regular servicing.

These decisions must be coordinated with architects, engineers, and development managers. The operator does not replace technical specialists; they complement their work with expertise in commercial performance, service delivery, and maintenance.

For example, a layout that makes turnover cleaning difficult may increase the time required to prepare each unit. A common area that requires permanent staffing may also introduce recurring costs that should be evaluated before it becomes part of the project.

The earlier these requirements are identified, the more options remain for addressing them without modifying completed construction or compromising usable space.

3. Before Handover: Plan Furnishing and Procurement

The next critical stage is planning the furniture, fixtures, and equipment required to make the units operational.

In hospitality, these items are commonly grouped under the term FF&E (Furniture, Fixtures and Equipment). Selection should go beyond aesthetics and consider durability, ease of cleaning, maintenance requirements, spare-part availability, and replacement costs.

The operator can define specifications for each unit type, establish consistent standards, and coordinate procurement with the construction schedule.

Items to plan for include furniture, appliances, lighting, connectivity, access systems, and the supplies needed to prepare units between reservations.

It is also important to define who funds the equipment, approves purchases, receives deliveries, and manages warranties. Responsibilities will depend on the agreement between the developer, property owners, and operator.

Centralized procurement can make supplier comparisons easier and help maintain consistent quality across units. It can also identify potential supply delays before they affect the opening schedule.

The goal is to ensure that furnishing follows a defined operational standard rather than becoming a collection of individual decisions made at the end of construction.

4. Before Opening: Prepare Operations and Commercial Channels

Building handover does not mean the operation is ready to welcome guests.

Before opening, procedures, staffing, technology, and commercial channels must be organized so that reservations can be managed and services delivered effectively.

Depending on the project’s characteristics, the operator should coordinate:

  • Housekeeping, inspection, and unit-readiness procedures.
  • Guest check-in and check-out processes.
  • Guest inquiries and incident management.
  • Reservation, availability, and rate management.
  • Preventive and corrective maintenance.
  • Inventory and equipment control.
  • Staff training and the assignment of responsibilities.
  • Financial reporting and owner settlements.

Commercial preparation also requires advance planning. Listings, photography, distribution-channel setup, booking policies, and initial rates should be ready in sufficient time.

If these tasks begin only when the keys are handed over, delays, coordination problems, and an inconsistent initial guest experience may follow.

Opening should be treated as a structured launch phase with defined responsibilities, deadlines, and quality standards. This makes it possible to confirm that the units are ready and the processes are working before the first reservations arrive.

5. During the First Months: Measure Performance and Adjust the Strategy

The operator’s role continues after opening. During the first few months, projections should be compared with actual results to identify gaps and adjust the operating model.

Demand may differ from initial estimates, certain unit types may prove more popular, and operating costs may reveal opportunities for improvement.

Relevant indicators include:

  • Occupancy: The percentage of available nights that are sold during a given period.
  • ADR (Average Daily Rate): The average accommodation revenue per sold night, calculated by dividing accommodation revenue by the number of nights sold.
  • RevPAR (Revenue per Available Room): Accommodation revenue per available unit or room, calculated by dividing accommodation revenue by the relevant available inventory for the period.
  • Operating costs: Expenses required to deliver the service and keep the units in suitable condition.
  • Service quality: Guest feedback, incidents, and compliance with service standards.
  • Financial performance: Revenue minus the costs included in the analysis, with a clear definition of which expenses are counted.

These metrics should be interpreted together. High occupancy does not guarantee a strong financial result if rates are too low or costs are excessive. Similarly, raising prices without considering demand may reduce bookings.

The operator uses this information to review pricing, distribution channels, procedures, procurement, and maintenance. The results can also provide valuable insights for future phases of the development.

Operational stabilization does not happen automatically when a building opens. It requires ongoing monitoring, performance comparisons, and continuous adjustments.

What Happens If the Operator Gets Involved Too Late?

Late involvement does not prevent a project from improving. An operator can reorganize processes, review furnishing, optimize rates, and address certain service issues. However, the available options will depend on the property’s condition and the commitments already made.

Potential challenges include unit types that do not match demand, insufficient operational space, furnishing costs that exceed initial estimates, and building systems that are difficult to maintain.

Commercial expectations established during presales may also need to be reviewed. The rental program must be coordinated with owners’ obligations and the applicable condominium rules.

At this stage, some decisions become corrective projects rather than planning decisions, potentially requiring additional time and investment.

For this reason, evaluating an operator should involve more than comparing management fees. Developers should also consider which decisions the operator can help improve before they become permanent constraints.

The Operator as a Strategic Partner for the Developer

A property manager and an integrated short-term rental operator may perform different functions.

Traditional property management generally focuses on managing an existing property. An integrated operator may also contribute to product definition, furnishing plans, service organization, marketing, and performance monitoring.

This approach connects three dimensions that should be planned together: product, operations, and demand.

For developers, this means evaluating operational requirements before finalizing major investment decisions. For owners, it means having defined operating rules and reporting mechanisms. For guests, it aims to deliver an experience consistent with what has been advertised and with the accommodation’s market positioning.

At Domus Rentals, this support can begin with site evaluation and feasibility analysis, continue through design and furnishing, and extend to launch and stabilized operations.

The specific scope will depend on the project’s stage, characteristics, and agreement between the parties. A development in presales requires different decisions from a newly completed building or an asset that is already operating.

Conclusion: Bring the Operator In Before Key Decisions Are Finalized

The most favorable time to bring a short-term rental operator into a project is during the initial evaluation phase, before decisions that shape the product and its operation are finalized.

The operator’s involvement can continue through architectural design, furnishing, opening preparations, and ongoing operations. If the project is already built, there are still opportunities for improvement, although some interventions may require more investment, time, or adaptation.

The key is to recognize that a development intended for short-term rentals is more than a building with apartments available for rent. It is an accommodation product that must respond to specific demand, operate efficiently, and sustain a coherent commercial proposition.

Integrating these considerations from the planning stage helps identify requirements early, allocate responsibilities, and make better-informed decisions to support the asset’s long-term performance.

Picture of Gonzalo Ruiz de Castroviejo

Gonzalo Ruiz de Castroviejo