The profitability of a short-term rental development is largely determined before the building even exists. Domus provides support from the initial land assessment to the final operational stage.
01
Where to begin?
Domus can be entered at any stage, but it doesn’t behave the same way in every stage. Choose yours and go directly to the phases that apply to you.
01
The rental program is designed with the product in mind: location, mix of types and equipment designed for short stays.
02
Centralized equipment, operation set up from the day of delivery and distribution on platforms from the first month.
03
Refurbishment and re-equipping to raise mid-to-high-end units to the standard, with prior study and published admission criteria.
Journey
Six phases from the land to a stabilized operation. The earlier the operator comes in, the more value it adds.
02
Six phases
The value an operator brings is greater the earlier in the phase they enter. This is what we do at each stage.
Before committing to the land, an analysis of the site’s actual vacation demand, existing competition, seasonality, and achievable price ceiling should be conducted. The conclusion may be that the project should not be a short-term rental, and that is also a valuable answer.
Phase 0 · pre-land acquisition
The mix of units, interior layout, sizing of common areas, and location of future service centers. This is the phase where a two-hour floor plan decision determines ten years of income.
Phase 1 · design
FF&E specification by type, supplier selection and negotiation, centralized purchasing, and delivery schedule aligned with construction. A single standard for the entire building, regardless of who purchases each unit.
Phase 2 · Pre-delivery
Implementation of the operations manual, recruitment and training of teams, setup of front desk and services, installation of the technology stack and registration in distribution channels.
Phase 3 · launch
Opening channels, introductory pricing strategy, building initial reputation, and making initial payments to owners. This is the phase that establishes the reputation the building will maintain for years to come.
Phase 4 · first 12 months
Continuous revenue management, standard auditing, scheduled asset renewal, direct channel growth, and consolidated reporting for next-stage marketing.
Phase 5 onwards
03
Agreement models
We’ve published the conversation structure so the first meeting isn’t spent clarifying the basics. The specific conditions depend on the project, but these are always the variables.
Who finances the equipping of the units, the assembly of adjacent services, and the working capital for the first months of operation?.
Fee model —commission on income, management fee or mixed— and classification of expenses between operating, owner and horizontal property.
Domus operates them directly, manages them on behalf of a third party, or grants them under concession. Margin and risk allocation in each case.
Conditions offered to unit buyers, obligations assumed by each party, and what happens to units that are not included in the program.
Duration, exclusivity over the inventory, renewal and exit conditions for both parties.
What stage is your project at?
We tell you what changes in your case and what you should decide now, before committing to a product.

At the table from day one
Before signing, the investor buyer hears from the people who will run the building: how responsibility is shared, which rules apply and what reporting they will receive.
04
Sales pitch
A buyer evaluating a unit as an investment always asks the same question: who will operate this and what results are expected? Being able to answer that question with an identified operator, documented standards, and verifiable figures from other projects changes the conversation.
The development process stops selling square meters with an expectation and starts selling a stake in an operation that is already up and running.
We prepared the supporting material:
01
Performance projection by type.
02
Rental program description.
03
Comparable data from actual operations.
Do you have any further questions? Write to us and we will respond within 48 business hours.
Yes, provided there is a permit for tourist accommodation. Article 21 of Law 80 of 2012 prohibits rentals of less than 45 days in the district of Panama to anyone without such a permit, with penalties from the Panama Tourism Authority (ATP) ranging from $5,000 to $50,000. The usual path for a development is the horizontal property ownership model for tourism, in which the owners transfer their unit to an operator who then manages it. You can read the details in the legal framework guide.
It depends on the agreement model. The developer can finance it and pass it on to the sale price, each buyer can assume it within a fixed package that Domus specifies and purchases centrally, or it can be a combination of both. What doesn’t allow for variation is the standard: all units in the program are equipped the same, because a single unit below that standard affects the overall quality of the entire building.
It depends on the destination, the type of property, and the product. Domus does not publish generic projections: it calculates them for each project in the feasibility study, taking into account historical demand for the location, real-world comparables, and seasonality. As a market reference, gross residential rental yields in high-demand areas of Panama City range between 5% and 8% per year, according to industry sources.
The feasibility study analyzes location, unit mix, service potential, and projected performance. We respond within 48 business hours.